Blog Archives

PNG: InterOil Net Profit Climbs

https://i0.wp.com/d1dep6bscgu00w.cloudfront.net/wp-content/uploads/2012/05/InterOil-Net-Profit-Climbs.jpg

InterOil said today its net profit for the quarter ended March 31, 2012 was $9.4 million compared with a net profit of $0.7 million for the same period in 2011, an improvement of $8.7 million.

First Quarter 2012 Highlights and Recent Developments

  • As of April 6, 2012, InterOil drilled the Triceratops-2 well in Papua New Guinea through the entire carbonate interval to a total depth of 7,336 feet (2,236 meters). The acquisition of wireline logs was completed on April 14, 2012 and the testing program is ongoing. The logs and DST pressure data indicate two separate, carbonate reservoir intervals with separate pressure systems and potentially separate or stacked hydrocarbon pay. The upper reservoir interval contains gas and condensate which preliminary pressure data indicates is in communication with the gas and condensate tested 3.8 kilometers away in the Bwata-1 well. The deeper zone lies below a 264 feet (80.5 meter) thick marl and argillaceous limestone interval, likely an intra-formational seal, where an independent formation evaluation indicates potential liquid hydrocarbons. The presence of movable hydrocarbons in the lower reservoir interval, at this stage, has not been confirmed with testing. However, a small volume of light oil of condensate composition was recovered.
  • Net profit for the quarter ended March 31, 2012 was $9.4 million. The operating segments of Corporate, Midstream Refining and Downstream collectively derived a net profit for the quarter of $28.6 million, while the investments in the development segments of Upstream and Midstream Liquefaction resulted in a net loss of $19.2 million.
  • Subsequent to quarter end, InterOil signed a binding Heads of Agreement with Pacific Rubiales Energy  to be able to earn a 10.0% net (12.9% gross) participating interest in PPL237, which includes the Triceratops structure. The transaction contemplates staged initial cash payments totaling $116.0 million, an additional carry of 25% of the costs of an agreed exploration work program, and a final resource payment. PRE has paid the initial $20 million of the staged cash payments. Definitive agreements are in the process of being finalized.

InterOil’s Chief Executive Officer Phil Mulacek commented, “We are pleased to report another successful quarter of profitability from our operating business. Additionally, we are excited to welcome Pacific Rubiales as partners in PPL 237, the company brings valuable expertise to our team.”

In regards to the ongoing LNG partnering process, Mr. Mulacek stated “We are continuing to work with our advisors to obtain a strategic partner. We have received conforming and non-conforming bids for the LNG partnering and sell down of an interest in the Elk and Antelope fields that we believe would be accretive to shareholders. We are now set to engage with a shortlist of significant LNG industry participants with a view to concluding discussions and entering into an agreement this quarter. The end result of the partnering process is envisioned to fully satisfy all the terms of the 2009 LNG Project Agreement.”

As to the Triceratops-2 well, Mr. Mulacek noted that, “Despite mechanical difficulties in obtaining a successful drill stem test from zones of interest in the lower hydrocarbon interval, we are very encouraged by gas and liquid hydrocarbon testing ongoing at the Triceratops-2 well. A plan is in place to evaluate the entire drilled interval and would likely include casing the entire interval and perforating zones of interest to obtain definitive results. Our prospect inventory is maturing and we anticipate that it will support our goal of a multi-year, multi-well exploration program. We believe that these achievements, combined with our strong balance sheet, support our continued growth and operational success.”

Source

Pacific Rubiales Makes Gas Discovery in Colombia

image

Pacific Rubiales Energy said today that it has discovered natural gas and condensate in the Cotorra-1X exploration well, drilled on the Guama Block in the Lower Magdalena basin.

The Company has 100% working interest in the block and is the operator.

Ronald Pantin, Chief Executive Officer of the Company commented: “this is an important exploration discovery for Pacific Rubiales and demonstrates the potential of both the Guama block and Lower Magdalena basin where the Company has a large exploration acreage position and is looking to increase its gas reserves to support its initiative to develop an LNG export market in the future.

The Cotorra-1X well was drilled as an exploratory well after an earlier exploration success on the block, the Pedernalito-1X well drilled in 2010. The well targeted Porquero Medio sands and silts of Miocene age, a low-permeability play successfully tested by Pedernalito-1X. Cotorra-1X was drilled to a total depth of 7210 feet in mid-January. The petrophysical evaluation showed a total of 40 feet of net pay, with average 20% porosity.

The well was perforated only in the deeper pay zone, across two intervals; leaving overlying pay zones untested for further evaluation.

After clean-up while flowing through a 1/2″ choke, Cotorra-1X reached a maximum gas flow rate of 7.5 MMcf/d and 370 bbl/d 56 degrees API condensate, followed by a three-stage isochronal and one extended flow test through 12/64″ choke which flowed at 2.6 MMcf/d and 121 bbl/d condensate at 3137 psi well head pressure.

During the month, the Company also completed drilling the Apamate-2X exploration well on its 100 percent owned and operated La Creciente Block. The well failed to test hydrocarbon flow at economic rates and was plugged and abandoned.

Articles

Source

Estrella shuts down rigs in Colombia because of unrest

 

Coat of arms of Republic of Colombia.

Estrella shuts down rigs in Colombia because of unrest – Oil | Platts News Article & Story.

%d bloggers like this: