Blog Archives

Seabox AS Acquired by NOV

National Oilwell Varco (NOV) has acquired 97% of the shares in Seabox for an undisclosed amount from a group of shareholders led by HitecVision.

Seabox is a Norwegian subsea technology company founded around the patented SWIT technology (Subsea Water Intake & Treatment). The technology enables treatment of raw seawater on the seabed (as opposed to on a platform) for injection into oil & gas wells for pressure support and increased oil recovery.

The company was established in 2004, and has, through a series of Joint Industry Projects backed by the Norwegian Research Council and by potential end-users such as ExxonMobil, ConocoPhillips, Shell, Total, Statoil, GDF Suez and others, developed the technology to a level where it is now ready for commercialization. Seabox has 12 employees.

Helge Lunde, CEO of Seabox comments: “We are very excited to team up with NOV’s global organization, which will significantly increase our reach and chances of succeeding in commercializing our technology. We are both proud and happy for their recognition of our efforts and technical solutions, and their commitment to backing us through the coming growth phase. We are convinced that our growth will be faster and stronger together with NOV.”

Michael Hjorth, President of Flexibles and Subsea Production Systems, comments: “NOV has a strong history and presence in Norway, where some of our key technologies for drilling, turret mooring and deck cranes have been developed, and to a large degree also manufactured. When it comes to subsea, which is an area where NOV wants to develop and expand, Norway is pretty much the “Silicon Valley” of the industry, so it is natural for us to search for new technologies and ideas here. In Seabox we have found what we deem to be innovative yet robust technical solutions, which offer more cost effective solutions but more importantly will offer the oil & gas companies greater flexibility in optimizing their reservoir drainage and field profitability. This is a huge market, with some 250 million barrels of seawater injected daily world-wide, which is almost three times the daily oil production. We are excited to explore these market opportunities together with Seabox.”

Image: Seabox

Source

Worldwide Field Development News Jan 25 – Jan 31, 2014

This week the SubseaIQ team added 4 new projects and updated 22 projects. You can see all the updates made over any time period via the Project Update History search. The latest offshore field develoment news and activities are listed below for your convenience.

Mediterranean

Remedial Operations Complete at Eni’s Guendalina Field

Jan 31, 2014 – Production from the Guendalina field remains down according the 4Q 2013 Operational Update provided by Mediterranean Oil & Gas (MOG). Low manifold pressure necessitated the shut-in of the GUE 3ss well in August 2013. Eni, the field operator, determined that the reservoir was in good condition and that a blockage in the production string was causing the poor performance. Remedial operations were undertaken in December but progress was hampered by poor weather conditions in the Adriatic. Intervention operations were completed Jan. 11, 2014 and the well returned to a low-production rate. The flow rate will improve as the well cleans up. Eni and MOG maintain 80% and 20% stakes respectively.

Project Details: Guendalina

Asia – SouthEast

Roc Oil Submits Bentara Field Development Plan

Jan 31, 2014 – In December 2013, Roc Oil submitted a Field Development Plan (FDP) to Petronas concerning the Bentara field in the Balai Cluster offshore Malaysia. The FDP outlines a two-phase development and approval is being sought for the first phase which involves early production utilizing the existing wells and facilities established during the pre-development phase. The company expects the FDP to be approved during 1Q 2014.

Project Details: Balai Cluster

Salamander Expects Bualuang Restart in February

Jan 31, 2014 – Salamander Energy sees production from the Bualuang field recommencing in early February after it was stopped in November 2013 when bad weather caused the Rubicon Vantage FPSO to drift off location and damage the production riser. Since then, divers have completed a full inspection and replacement riser and spool materials are being moved to location. While progress is being made, poor weather conditions have slowed repair efforts. A development drilling program being carried out by the Atwood Mako (400′ ILC) has not been interrupted by the event and two production wells have been drilled since the shutdown. Salamander’s production forecast for the field remains unchanged and is expected to average between 13,000 and 16,000 boepd.

Project Details: Bualuang

Ocean General Spuds Silver Sillago Prospect off Vietnam

Jan 31, 2014 – Pan Pacific Petroleum was advised by Premier Oil, operator of Block 07/03 offshore Vietnam, that the Ocean General (mid-water semisub) spudded the 07/03-CD-1X wildcat well on Jan. 28, 2014. The well is being drilled in 426 feet of water and is expected to reach the proposed depth of 12,522 feet. The well is designed to test the Miocene clastic reservoirs of the Silver Silago prospect.

Project Details: Ca Duc (Silver Sillago)

KrisEnergy Acquires 60% Interest in Thailand Block G3/48

Jan 31, 2014 – Through an agreement with Mubadala Petroleum, KrisEnergy acquired a 60% operating interest in Block G3/48 in the Gulf of Thailand. The block covers an area of 1,126 square miles with water depths ranging from 65 to 165 feet. Partners in the block include Tap Energy (30%) and Northern Gulf Oil Company (10%). The agreement is subject to the customary regulatory approvals.

Project Details: Pathum

MidEast – Persian Gulf

Technip Wins EPCI Contract for DPE’s Al Jalilah Development

Jan 31, 2014 – Technip was awarded an engineering, procurement, construction and installation (EPCI) contract by Dubai Petroleum Establishment (DPE) concerning the Jalilah B field development project. Work scope includes construction and installation of the Jalilah B platform, the addition of 13 new risers on existing platforms and the installation of 68 miles of 6 to 24-inch pipeline. The project will be executed from Technip’s fast-track center in Dubai and is scheduled for completion in the second half of 2014.

Project Details: Al Jalilah

Europe – North Sea

Lundin Reports Poor Drilling Results at Torvastad

Jan 31, 2014 – Lundin Petroleum is in the process of completing a sidetrack well at its Torvastad prospect in license PL501 near the Johan Sverdrup discovery. Well 16/2-20A is being drilled by the Island Innovator (mid-water semisub) to investigate the potential of an up-flank continuous Jurassic reservoir. Oil shows were seen in the main target but reservoir quality was poor. Lundin operates the license and carries 40% stake. Its partners include Statoil (40%) and Maersk Oil Norway (20%).

Project Details: Torvastad

Parkmead Raises Cash for UK North Sea Ops

Jan 30, 2014 – Through an oversubscribed share placing, Parkmead Group was able to raise $66 million in an effort to bolster some of its activities in the UK North Sea. Parkmead, operator of the Athena field in License P1293, will use a portion of the funds to enhance production from the field. The group plans to carry out a workover of the P4 well. If successful, the operation could increase field production to 9,000 bopd. Locations are also being evaluated for an additional production well that has the potential to add 1,100 bopd to the production stream. Proceeds from the placing will also allow the group to test several prosepcts in its portfolio such as Skerryvore, Possum, Blackadder and Davaar. Well planning is already underway for Skerryvore.

Project Details: Athena

Faroe Finds Oil and Gas at Novus

Jan 30, 2014 – Operator Faroe Petroleum announced an oil and gas discovery at its Novus prospect in license PL645 in the Norwegian Sea. Well 6507/10-2S was drilled by the West Navigator (UDW drillship) to a depth of 9,701 feet. A 39-foot net gas column and 41-foot net oil column were encountered in high quality Garn reservoir. Secondary targets in the Ile and Tilje formations proved to be water wet. Results from pressure and fluid sampling indicate the discovery reservoirs hold between 6 and 15 MMboe. Additionally, the results will be integrated into the existing geologic model of the area to de-risk the remaining prospects and leads in the license.

Project Details: Novus

Asia – Caspian

Oil Production Begins at West Chirag in the Caspian Sea

Jan 31, 2014 – Production activities at the West Chirag platform are underway according to the BP-operated Azerbaijan International Operating Company (AIOC). The platform is part of the Azeri-Chirag-Guneshli (ACG) development in the Azerbaijan sector of the Caspian Sea. On January 28, 2014 oil began flowing from the J05 development well. Production will increase throughout the year as additional wells are brought on line. As a whole, the ACG fields have produced over 2.3 billion barrels and, with future development, is expected to be a viable project for many decades. The West Chirag platform was installed in 557 feet of water and has a designed processing capacity of 183 thousand bopd. Startup of West Chirag is the final phase of the Chirag Oil Project and is expected to greatly enhance the deliverability of the ACG development.

Project Details: Azeri-Chirag-Gunashli

Australia

Gas Shows and LWD Indicators Lead to Grace-1 Logging Program

Jan 31, 2014 – Karoon Gas reports that total depth has been reached at the Grace-1 exploration well in license WA-314-P offshore Western Australia. The well was drilled by the Transocean Legend (mid-water semisub) to a measured depth of 16,630 feet. High gas levels seen while drilling and pressure samples taken from logging while drilling (LWD) equipment Karoon and ConocoPhillips (the operator) to run wireline logs over the zone of interest. Logging and sampling results are expected during the coming weeks.

Project Details: Grace

S. America – Brazil

Shell Trims Interest in Parque das Conchas Development

Jan 31, 2014 – Shell announced its intention to divest 23% of its interest in the Parque das Conchas development to Qatar Petroleum International for approximately $1 billion. Once the agreement is approved by Brazilian regulators, Shell’s operating interest will be reduced to 50%. Parque das Conchas currently produces at a rate of 50,000 boepd since the Ostra and Argonauta B-West fields were brought on-stream in 2009 as part of Phase 1. Phase 2 was completed in October 2013 when oil production commenced at Argonauta O-North. In July 2013, Shell and its partner ONGC (27%) made the final investment decision regarding Phase 3 and will consist of subsea facilities tying the Argonauta O-South and Massa fields to the Espirito Santo FPSO.

Project Details: Parque das Conchas (BC-10)

Huisman to Deliver Well Intervention System for Helix’s Q7000

Huisman, a Dutch specialist in lifting, drilling and subsea solutions, has secured a new contract from Helix Energy Solutions Group, Inc. for the delivery of a Well Intervention System onboard Helix’s new build Semi submersible “Q7000”.

The system, which is based on Huisman’s proven Multi Purpose Tower (MPT) design, will be built by the Huisman production facility in China.

The fully integrated 800mt Well Intervention System will be capable of handling the Intervention stack, the high pressure riser and other components. The Huisman Multi Purpose Tower has the same functionality as a normal derrick but offers improved accessibility to the well center, which allows for new improved handling procedures that increase efficiency and safety. The superior accessibility to the well center and the small footprint of the MPT are ideally suited for well intervention and subsea installation services. Subsea equipment can be skidded into the well center from three sides, offering enhanced flexibility.

The active heave compensation hoist system of the MPT provides excellent means for safe landing of equipment at the seabed while the passive heave compensation system provides a safe and redundant means to supply top tension to the risers. A guide trolley, travelling the entire length of the tower, guides the subsea modules during lifting operations. The system also features multiple transfer hatches that can be used to move equipment into the well center, and a skiddable work floor covering the moonpool flush with main deck.

The skiddable work floor allows large subsea modules to be deployed, without the need for a raised work floor. When large objects need to pass the moonpool the work floor can be skidded aside. In closed position, the work floor is flush with the main deck, which significantly reduces HSE risks and improves equipment handling on deck.

In addition to the Well Intervention System Huisman will also supply a 150mt Knuckle Boom Crane and a 160mt Pedestal Mounted Crane. Previous orders from Helix, amongst others, the Multi Purpose Tower onboard the “Q4000”, “Well Enhancer” as well as the cranes for the “Q4000” and “Q5000”.

Press Release, October 09, 2013

Source

Gulf of Mexico: W&T Offshore Makes Discovery at Mahogany Field

W&T Offshore, Inc. announced that it has made a subsalt discovery in a deep shelf exploratory target beneath its Ship Shoal 349 “Mahogany” Field.

The SS 359 A-14 well has exceeded the Company’s expectations and is currently producing from the targeted T-Sand (in excess of 17,200′ total vertical depth), at an initial flow back rate of 3,030 barrels of oil per day and 5.6 million cubic feet of gas per day, for a total of approximately 4,000 barrels of oil equivalent (Boe) per day (3,310 Boe per day net of royalty to W&T) with a flowing tubing pressure of approximately 9,400 psi surface pressure. The T-Sand is the deepest sand discovered in this field, as there is additional pay identified in the M-Sand, N-Sand, and O-Sand, all of which represent future reserve additions to the Company. The well also penetrated a thicker than expected P-sand interval (the main field pay sand) which will also serve as a future recompletion. In total, the A-14 well logged over 370 feet of net oil pay, with the T-Sand accounting for 108 feet of the total net pay. Success from the A-14 T-sand will stimulate additional drilling in 2014 to exploit the four newly discovered oil sands that were encountered in the A-14 well. W&T holds a 100% working interest in the field.

Tracy Krohn, W&T Offshore’s Chairman and CEO, stated, “Our exploration team utilized our subsalt imaging technology to identify and deliver this subsalt discovery which is a deep shelf exploration extension to our producing Mahogany Field. This new oil discovery is part of our organic growth plan and adds substantial value to the Company. We found a very high quality oil sand in the T-sand reservoir with great flow characteristics. Another key value driver on this project is our ability to produce this discovery immediately through our existing infrastructure at Mahogany. We are evaluating additional targets in this highly prolific field based upon our continuing success and look forward to our next exploratory well at Mahogany, the A-15 well, which should begin drilling in in September.”

The platform rig at Mahogany is currently working on a major recompletion in the A-4 well, designed to bring a behind pipe P-Sand interval into production at an expected rate of 1,000 Boe per day, net of royalties to W&T with an anticipated production date of August or September. Following the A-4 recomplete the Company expects to spud the A-15 subsalt exploratory well, a multi-horizon target that is anticipated to encounter multiple stacked oil sand targets. The A-15 well is scheduled to reach total depth near the end of 2013 or early 2014 with a target IP rate of 1,390 Boe per day, net of royalty to W&T. The unrisked reserve potential associated with the A-15 well is anticipated to be in the range of 1.8 to 6.2 million Boe.

Source

Houston TX: Chevron to Build Office Building in the World’s Energy Capital

Chevron U.S.A. Inc. announced plans to construct an office building in downtown Houston to accommodate its business growth and expanding workforce in the world’s energy capital.

The 50-story, 1.7 million-square-foot building will be located at 1600 Louisiana Street at Pease. Together with Chevron’s existing properties at 1500 Louisiana and 1400 Smith, the buildings will comprise an urban campus with indoor and outdoor common areas, enhanced dining facilities, a fitness center, training and conference facilities, and additional parking.

“This announcement underscores Chevron’s long-term commitment to Houston and its role as the epicenter of the global energy industry,” said Bereket Haregot, president of Chevron’s Business and Real Estate Services division. “Houston plays a vital and growing role in Chevron’s global business. The new building and expanded urban campus will provide a first-rate work environment for our employees and help us remain the employer of choice.”

The headquarters of Chevron Corporation, the parent company of Chevron U.S.A., will remain in California, where they have been located for more than 130 years.

Final investment decision for the project, designed by HOK, is expected in the second quarter of 2014. Groundbreaking will follow final investment decision, and occupancy is anticipated to begin in the fourth quarter of 2016.

Press Release, July 4, 2013

Source

USA: Hercules Offshore Sells Domestic Liftboats to All Coast

All Coast, LLC, a newly formed company for the marine services industry founded by John Powers and John Nesser III, has completed the acquisition of Hercules Offshore’s domestic liftboat assets.

This $57.5 million acquisition includes 29 actively marketed liftboats ranging from class 105 to class 229, 10 inactive liftboats and additional related assets.

All Coast is a limited liability company, newly formed for this transaction, with John Powers and John Nesser III leading as Managers and Co-CEOs.

Powers and Nesser, All Coast managers and co-chief executive officers, each have more than 40 years of experience in the oil and gas, engineering and maritime industries.

Throughout his career, Powers has owned and operated numerous energy and marine services companies including Power Offshore Services, LLC; Reeled Tubing, LLC; Seatrax, LLC; and Coastal Drilling Co.

Previously, Nesser served as the executive vice president and chief operating officer for McDermott International, where he held executive positions for more than 10 years.

All Coast domestic operations will be led by Byron Allemand, vice president and chief operating officer, and the operations center will remain in Lafayette, La.

Nesser commented that “John and I have been looking for the opportunity to re-enter the liftboat industry as owners and operators for several years.

“We look forward to the challenge of serving the offshore market with the highest standards of service and safety,” Nesser further noted. “We expect to grow All Coast and expand our fleet with new acquisitions and new builds.”

Joining Powers and Nesser is The Fleming Corporation, a private equity investment firm that will provide capital and a long-term perspective on value creation. The new owners are committed to growing the fleet’s market-leading position. Financing for the acquisition and working capital has been provided by Whitney Bank.

Source

VIDEO: ‘Overdrill’ Drillship Design by Fincantieri and Aker Solutions

Fincantieri, one of the world’s largest shipbuilders, has launched a video showing its drillship design: The Overdrill.

The vessel is the next generation drillship which will enable the drilling contractors to drill to a maximum depth of 50.000 feet.

The design has been developed by joint effort of Fincantieri and Aker Solutions. The OVERDRILL design was first introduced to the public last month during the Offshore Technology Conference in Houston, USA.

During the event, Giuseppe Coronella, EVP of Fincantieri Offshore, stated: “The offshore drilling market is driven, on the one hand, by demand for traditional standard systems and, on the other, by ultra-deepwater exploration demanding innovative solutions. With support from Aker Solutions, Fincantieri has produced a rig design that provides solutions to both these needs”.

Click here to see the video.

Source

Ukraine: Ulstein’s CSV Polar Onyx Launched

The hull of the offshore construction and well intervention vessel “Polar Onyx”, built by the order from Norwegian company Ulstein Hull AS, has been launched at Shipyard Zaliv on May 31, 2013.

The hull is currently moored alongside the outfitting berth of the Ukraine-based yard and is waiting to be towed to Norway to the place of final completion.

The high-capacity vessel is designed for operations in harsh conditions and deep waters, with a length of 130 meters and a 25 meter beam. The vessel is built to the highest standard for dynamic positioning, DP2+, and is equipped with a 250t AHC offshore crane. It is also equipped with a 275t Vertical Lay System above a moonpool which is capable of installing flexible pipe and umbilicals to 3,000m water depth.

The vessel has recently been chartered to Ceona Services (UK) for a period of 5 years and it will start working for Ceona immediately upon delivery from Ulstein Verft in the first quarter of 2014.

In total, during the six years of cooperation between Zaliv and Ulstein Hull AS, fourteen vessels have been built for work in the oil and gas industry.

Related:

Ceona Hires GC Rieber Shipping’s Newbuild CSV

Source

%d bloggers like this: