Worldwide Field Development News Oct 19 – Oct 25, 2013

This week the SubseaIQ team added 4 new projects and updated 13 projects. You can see all the updates made over any time period via the Project Update History search. The latest offshore field development news and activities are listed below for your convenience.

Africa – West

Lukoil Strikes Oil Offshore Sierra Leone

Oct 24, 2013 – Lukoil completed drilling the Savannah-1X wildcat in the Sl-5-11 license offshore Sierra Leone. The well was drilled on schedule by the Eirik Raude (UDW semisub) to a depth of 14,519 feet. Several oil-bearing reservoirs were confirmed and oil samples were taken from Turonian sands. Drilling data will be evaluated through the end of the year to advance the company’s geological understanding of the area.

Project Details: Savannah

Asia – Far East

CNOOC Announces Additional Bohai Bay Discoveries

Oct 24, 2013 – CNOOC announced an oil discovery at its Luda 5-2 North field in Bohai Bay. The Luda 5-2N-2 and Luda 5-2N-4 wells were each drilled to a depth of 3,740 feet and encountered gross pay zones of 390 and 280 feet respectively. Luda 5-2N-2 tested oil at a rate 1,040 barrels per day. Additionally, the company announced the successful appraisal of the Kenli 9-5/9-6 oil field. The Kenli 9-5-2D and 9-6-2 wells were drilled in the southern part of Bohai Bay. Kenli 9-6-2 flowed at a rate of 200 barrels per day.

S. America – Brazil

Petrobras-led Consortium to Develop Pre-Salt Libra Field

Oct 24, 2013 – A group of companies comprised of Petrobras, Shell, Total, CNPC and CNOOC won a 35-year production sharing contract to develop the Libra pre-salt oil field in the Santos Basin offshore Brazil. Libra is located in block BM-S-11 in 6,500 feet of water and is estimated to hold as much at 12 billion barrels of oil. Additional appraisal will be needed to determine the best development scenario and to confirm production rates that are currently estimated at 1.4 MMbopd. Petrobras will serve as the operator with a 40 percent stake on behalf of its partners Shell (20 percent), Total (20 percent), CNPC (10 percent) and CNOOC (10 percent).

Europe – North Sea

ENI’s Receives Disappointing Results at Bonna

Oct 24, 2013 – Drilling results at Eni’s Bonna prospect in the Barents Sea proved to be disappointing. Well 7016/2-1 was drilled by the Scarabeo 8 (UDW semisub) to a depth of 13,205 feet. The well was drilled to investigate the possibility of gas in the Eocene and Paleocene reservoirs of the Sotbakken Group. No reservoir-quality rocks were encountered and the well has been declared dry.

Project Details: Bonna

Asia – SouthEast

Songa Mercur Spuds Spuds ENI’s Ca Ngu Well

Oct 24, 2013 – Neon Energy announced the spud of the Ca Ngu-1 exploration well in Block 120 offshore Vietnam. The objective of the well is to prove the presence of hydrocarbons in Pliocene clastic and Miocene carbonate reservoirs. Block operator ENI secured the Songa Mercur (mid-water semisub) to drill the well in 885 feet of water to a target depth of around 4,900 feet. If successful, the well could de-risk the nearby Rua Bien and Ca Lang prospects. Block 120 partners consist of ENI (50%), Neon Energy (25%) and KrisEnergy (25%).

Project Details: Ca Ngu

Galoc-6H Flows at Expected Rate

Oct 24, 2013 – Subsea tree installation, well clean-up and flow testing of the Galoc-6H development well have successfully been completed at the Otto Energy-operated Galoc field. Galoc-6H flowed at a stable rate of 3,800 bopd on a 56/64-inch choke with a flowing tubing pressure of ~570 psi. These results were constrained by the testing equipment onboard the Ocean Patriot (mid-water semisub). Once tied into production facilities, Otto expects normal production from the well to reach 4,000 to 6,000 bopd. The 5H and 6H wells were drilled as part of the Phase II development plan which aims to increase field production to 12,000 bopd. Phase II production is scheduled to begin in November 2013.

Project Details: Galoc

S. America – Other & Carib.

Total to Proceed With Vega Pleyade Development

Oct 25, 2013 – French supermajor Total announced its decision to move forward with the development of the Vega Pleyade gas and condensate field offshore Argentina. The field is located in the Cuenca Marina Austral 1 (CMA-1) concession that Total has operated since 1978. Development consists of installing a new production platform in about 160 feet of water. Three production wells will be drilled from the platform and produced gas will flow through 48 miles of subsea pipeline to a treatment plant at Rio Cullen. In a separate initiative, Total will begin a drilling campaign in 2014 aimed at boosting production from the Carina field and providing additional appraisal in CMA-1. Total owns a 37.5 percent stake in the concession. Its partners include Wintershall (37.5 percent) and Pan American Energy (25 percent).

Project Details: Vega Pleyade

Australia

Eni Establishes Additional Resources at Evans Shoal

Oct 25, 2013 – Drilling operations are complete at the Eni-operated Evans Shoal North-1 appraisal well. The well, located in the Timor Sea, was drilled by the Ensco 104 (400′ ILC) to a depth of almost 13,000 feet. Results indicate that the Evans Shoal North-1 reservoir is in communication with the reservoir encountered while drilling Evans Shoal-2. Eni conducted a production test and achieved a constrained rate of 30 MMscfd. The operator estimates the Evans Shoal field to contain at least 8 Tcf of in place gas resources and remains committed to establishing a fast-track development in the area. Eni’s partners in the field include Shell (32.5 percent), Petronas (25 percent) and Osaka Gas (10 percent).

Project Details: Evans Shoal

ExxonMobil Flips the Switch at Tuna and Turrum

Oct 25, 2013 – ExxonMobil announced the start of production from its Kipper Tuna Turrum (KTT) project in the Bass Strait. Gas is now being produced at the Tuna field and oil is flowing from Turrum to the Marlin B production platform. At $4.3 billion, KTT is the largest domestic oil and gas development on Australia’s eastern seaboard. Production startup from the Kipper field is expected to commence in 2016.

Project Details: Kipper Tuna Turrum (KTT)

Advertisements

Posted on October 26, 2013, in Offshore FIeld Development and tagged , , , , , , , , , , . Bookmark the permalink. Comments Off on Worldwide Field Development News Oct 19 – Oct 25, 2013.

Comments are closed.

%d bloggers like this: