Daily Archives: September 2, 2012
‘Eastwooding’ Inspires National Empty Chair Day on Monday
Posted by mb50
by Michael Patrick Leahy 2 Sep 2012
In another sign that Clint Eastwood’s RNC talk to an empty chair has tapped in to broadly held opinions that President Obama is not getting the job done, word spread rapidly over the weekend among conservative new media outlets that an impromptu “National Empty Chair Day” is being planned for Monday.
William Jacobson at Legal Insurrection noted the phenomenon first, and Glenn Reynolds at Instapundit quickly picked up on it. According to Jacobson:
Monday – Empty Chair Day
That’s what reader Sandy writes:
Prof – Seems that there is an effort to make Monday “empty chair day”
[Here’s] an image of my front lawn, just mowed, to ensure the empty chair looks right. The sign next to the chair says:
“We own this country . . . Politicians are employees of ours . . . And when somebody does not do the job, we’ve got to let them go.” –Clint Eastwood (emphasis added)
As Professor Jacobson tells it, National Empty Chair Day is designed to be a user-driven event.
Who knew an empty chair could expose so much.
Send me your “empty chair” photos on Monday, and I’ll run them.
The Twitter hashtag is #EmptyChairDay
It now appears quite likely that the DNC will open on Monday with images of empty chairs dominating Facebook, Twitter, and the internet. Once again conservative new media outlets have framed the narrative that continues to get away from the Obama 2012 campaign team.
Related articles
- Monday is National Empty Chair Day (michellemalkin.com)
- ‘Eastwooding’ Inspires National Empty Chair Day on Monday (conservativebyte.com)
- Monday is Empty Chair Day! (twitchy.com)
Posted in AMERICAS, North America, One and Done, United States
Comments Off on ‘Eastwooding’ Inspires National Empty Chair Day on Monday
Tags: Barack Obama, Clint Eastwood, Glenn Reynolds, Instapundit, Legal Insurrection, Monday, National Empty Chair Day, Twitter, William Jacobson
Spain: Metalships & Docks to Build Subsea Construction Vessel for McDermott
Posted by mb50
McDermott International, Inc. (McDermott) will build another high capacity reeled pipelay vessel with top-tier payload capacity, tentatively named Lay Vessel 108 (LV108). The vessel will be a sister ship to the recently completed subsea construction vessel the Lay Vessel North Ocean 105 (LV105), and is to be built to similar specifications at Metalships and Docks S.A.U. shipyard in Vigo, Spain.
“LV108 is another milestone in our vessel renewal program focusing on the subsea construction market for flexible and rigid product installation,” said Stephen M. Johnson, Chairman, President and Chief Executive Officer of McDermott. “Market analysis indicates that the subsea and deepwater construction market is expected to continue to grow and there is demand for more tonnage in both the rigid reel lay and flexible lay markets. The LV108 is expected to meet this need.”
LV108 is designed for advanced deepwater operations with a high-capacity tower for rigid and flexible pipelay and state-of-the-art marine construction equipment that will enable installation of a variety of products to a depth of 10,000 feet, including rigid-reeled pipelines, subsea components and hardware, and deepwater moorings for floating facilities as well as flexible products – cables and umbilicals.
The principal characteristics of the vessel, such as payload, tension capacity and product size, will mirror those of the LV105, but McDermott anticipates enhanced functionality of the LV108 equipment design compared to the LV105. Delivery of LV108 is anticipated to be around third quarter 2014 for outfitting of the custom-designed lay system, built by a specialist fabricator in Europe.
The vertical reel will have a nominal payload of 2,500 tons plus, subject to vessel loading conditions, and a lay tower operational between 90 and 40 degrees. The nominal tension capacity is expected to be 400 tons, and the range of pipe the vessel can install is between 4 to 16 inches diameter. This 427-foot, dynamically positioned vessel will be equipped with a 400-ton heave compensated crane, will have a transit speed of 15 knots and will operate across a range of water depths up to more than 10,000 feet.
“In May we completed building and outfitting the LV105, a vessel that aims to improve our worldwide capabilities to meet the growing needs and technical challenges of the subsea and deepwater markets. The vessel will perform its first project in Asia in up to 4,430 feet of water. We look forward to LV108 joining the LV105 and other vessels in our fleet in 2014,” said Johnson.
Shipbuilding Tribune – Spain: Metalships & Docks to Build Subsea Construction Vessel for McDermott.
Related articles
- WWCS, DOF Subsea Conduct Subsea Services in US Gulf Of Mexico (mb50.wordpress.com)
- McDermott Wins Spar Hull Installation Contract (Gulf of Mexico) (worldmaritimenews.com)
- McDermott Bags Offshore Installation Gig in U.S. GOM (mb50.wordpress.com)
- Ulstein to Deliver Innovative Subsea Vessel to GC Rieber Shipping in 2014 (mb50.wordpress.com)
Posted in AMERICAS, MARINE VESSELS, North America, Spain, United States
Comments Off on Spain: Metalships & Docks to Build Subsea Construction Vessel for McDermott
Tags: Lay Vessel 108, Mcdermott, McDermott International, Metalships & Docks, News by topic, Pipe-laying ship, reeled pipelay vessel, shipbuilding news, Shipyard to Build, Spain, SubSea, subsea construction vessel