Texas: Helix Well Cap Arrival at Ingleside, Texas Shorebase

Helix Well Cap Arrival at Ingleside, Texas Shorebase

Designed for subsea oil spill containment the Helix Fast Response System (HFRS) Well Cap consists of an 18-3/4″ –10ksi H4 hydraulic wellhead connector and a 13-5/8″-10ksi dual ram block with an 18-3/4″-10ksi H-4 mandrel profile up. The connector can be changed out to any other type of connectors via the use of adapters. The cap has a 13-5/8″ bore and side outlets 4-1/16″-10K BX-155. All functions on the Well Cap will be ROV operable. Two 3-3/16″ vents relieve high pressure and/or flow rate.

Anyone can see this photo All rights reserved
Uploaded on May 11, 2012

Helix Well Cap Being Loaded Out at Ingleside, Texas Shorebase

Anyone can see this photo All rights reserved
Uploaded on May 11, 2012

Helix Well Cap Being Loaded Out at Ingleside, Texas Shorebase (2)

Anyone can see this photo All rights reserved
Uploaded on May 11, 2012

Helix Well Cap Being Loaded Out at Ingleside, Texas Shorebase (3)

Anyone can see this photo All rights reserved
Uploaded on May 11, 2012

Flickr: Helix ESG’s Photostream.

Advertisements

Posted on May 11, 2012, in AMERICAS, Ingleside, North America, Oil & Gas - offshore, Service, South Texas, Texas, United States and tagged , , , , , , , , , , . Bookmark the permalink. Comments Off on Texas: Helix Well Cap Arrival at Ingleside, Texas Shorebase.

Comments are closed.

%d bloggers like this: