USA: HWCG Chooses Sonardyne Acoustics for New GoM Well Containment Response System
Sonardyne’s wideband acoustic monitoring technology has been selected to play a key role in a new, emergency well containment system built by Trendsetter Engineering Inc. for the Helix Well Containment Group (HWCG).
The Helix Well Containment Group’s capping stack is the most advanced well response system in the world and was built by Trendsetter Engineering. The Sonardyne acoustic monitoring system is clearly visible on the upper left of the structure.
HWCG is a consortium of 24 operators in the Gulf of Mexico who have come together with the common goal of expanding capabilities and pooling technical expertise to quickly and comprehensively respond in the event of a deepwater well control incident.
The new emergency well response system comprises an intervention capping stack that would be placed over a damaged well to stop its flow. Its advanced design makes it capable of capturing and processing up to 55,000 barrels of oil per day and 95 million cubic feet of natural gas per day at surface pressures of up to 10,000 psig.
During an emergency, the supplied Sonardyne data acquisition system would be used to remotely monitor pressure and temperature sensors fitted to the capping stack. The system consists of a Surface Command Unit, intelligent Deep Acoustic Remote Transducers (DARTs) and a Subsea Electronics Module (SEM) that is capable of transmitting data at high speed to the surface for immediate analysis.
Mario Lugo, president of Trendsetter Engineering said, “The performance of Sonardyne’s wideband signal technology during the Macondo incident was a key factor for its selection. The technology was shown to work reliably in areas of extreme subsea noise. This is now the second time we have worked with Sonardyne on a system of this nature.”
The intervention capping stack will be continuously maintained by Trendsetter’s technical experts at its facilities in North Houston, where it will remain on-call for immediate deployment in the unlikely event that a deepwater well’s blowout preventer (BOP) fails to operate as designed.
Related articles
- Vent field discovery on Mid-Atlantic ridge (uwtreasures.wordpress.com)
- Spar Transportation and Installation (video) (mb50.wordpress.com)
- Shell Perdido: The first full field subsea separation and pumping system in the Gulf of Mexico. (video) (mb50.wordpress.com)
- Re-inventing subsea intervention to keep economics above water (mb50.wordpress.com)
- Well Containment Company Receives New “Capture Vessel” (gcaptain.com)
- Subsea:The Riserless Light Well Intervention – (Video) (mb50.wordpress.com)
- Statoil: Riserless light well intervention (mb50.wordpress.com)
Posted on October 11, 2011, in Drilling, Natural Gas, Oil & Gas - offshore, Subsea, United States and tagged Drilling, gulf of mexico, Helix Well Containment Group, Natural Gas, Offshore drilling, oil, Oil & Gas - offshore, Technology, technology, Trendsetter Engineering, United States. Bookmark the permalink. 4 Comments.
Continents of the World



Pingback: Wedding Rings Manila With Price
Pingback: Helix Breaks Ground on New South Texas Spoolbase Facility « Mb50's "Liquid Mud" Blog
Pingback: Helix seeks to provide capping stack in case of Cuba drill accident « Mb50's "Liquid Mud" Blog
Pingback: Feds approve Murphy drilling project using Helix emergency equipment « Mb50's "Liquid Mud" Blog